- Home
- Our Services
- Commercial
Commercial Construction Services
Opening a new location or expanding an existing one? On Point Construction delivers commercial buildouts on schedule, with the permitting and inspection work handled for you.
Why Choose On Point Construction for Your Commercial Project
Commercial work lives or dies on schedule. Every week your space sits unfinished is a week of rent without revenue, so we sequence trades tightly, keep long-lead items ordered early, and give you a build calendar you can plan a grand opening around. Our crews have delivered restaurants, medical offices, retail spaces, and warehouse conversions across Miami-Dade.
Schedule You Can Bank On
Business-Minded Sequencing
Transparent Pricing
Code Compliance & Safety You Can Count On
Commercial permitting in Miami-Dade involves more reviewers, more disciplines, and more inspections than residential work. We manage all of it so your certificate of occupancy is not the thing holding up your opening.
Permit Acquisition Support
Scheduled Inspections & Documentation
Industry Best Practices for On‑Site Safety
Compliance Tracking at Every Stage
Our Commitment to Delivering Your Space On Time
You get one point of contact, weekly progress photos, and a schedule that gets updated rather than quietly abandoned. When something slips, you hear it from us first, along with what we are doing about it. Clean, safe job sites are non-negotiable, particularly in occupied buildings.
Energy‑Efficient Commercial Building Options
Lower operating costs start at the framing stage. We build in the efficiency measures that keep your monthly utility bill down for the life of the lease.
High‑Efficiency Envelope
Lighting & Controls
Water Efficiency
Waste Reduction
Essential Systems for Commercial Spaces
A commercial space has to perform on day one under full load. We coordinate, oversee, and install the systems your business depends on.
Electrical & Power Distribution
Service sizing, panel and subpanel layout, dedicated circuits for equipment, and data infrastructure planned around how your business actually operates.
HVAC Design & Installation
Equipment sized to real occupancy and equipment loads, with zoning and ventilation that meet code and keep customers and staff comfortable.
Our commercial contractor team in Miami is the right partner for your next buildout.
Commercial Construction Areas We Serve
Request a Commercial Construction Estimate
our location
95 Merrick wy, Suite 325 Coral Gables, FL, 33134, USA
quick contact
Call Us: +1 (786) 209 7900
Mail Us :main@onpointgb.com
We will answer you within 24 hours via email, or you can call us directly, we are always ready to serve. Thank
Commercial Construction FAQ's
A straightforward tenant improvement typically runs 3 to 5 months from permit issuance, while ground-up commercial construction usually falls between 10 and 18 months. Plan review adds 2 to 4 months on the front end depending on the municipality. We give you a specific schedule once we have seen the drawings and know who is reviewing them.
Yes. We prepare the submittal package, coordinate responses from the architect and engineers, file with the correct building department, and schedule every inspection through certificate of occupancy. You do not deal with the permit counter.
Often, yes. For phased retail and office work we can build temporary partitions, keep entrances and exits functional, and schedule loud or dusty work outside your business hours. For a full gut or anything touching the main electrical service or fire system, a closure is usually unavoidable, and we will tell you that upfront rather than partway through.
It swings widely with use type, finish level, and whether the building is existing or new. A basic office fit-out and a full-service restaurant differ by a multiple, not a percentage. Rather than quote a number that will not hold, we walk the space, review your plans, and give you a written estimate broken out by scope.
Every commercial project we build meets the Florida Building Code’s High-Velocity Hurricane Zone requirements, which apply throughout Miami-Dade. That means impact-rated glazing and doors with valid Miami-Dade Notices of Acceptance, engineered roof and wall connections, and structural inspections at each milestone.
Yes, and we prefer to be involved before the drawings are final. Early constructability input catches the details that trigger plan review comments and change orders later. If you do not have a design team yet, we can recommend architects and engineers who work regularly in your municipality.
All of Miami-Dade County, including Doral, Brickell, Wynwood, Coral Gables, Miami Beach, Aventura, Hialeah, Kendall, Miami Lakes, Sunny Isles Beach, Coconut Grove, and South Miami.
Yes, on projects where it makes sense. Night and weekend work costs more per hour but often less overall once you account for lost revenue from a daytime closure. We will price both so you can compare them directly.
Yes. Most commercial leases carry building rules covering work hours, elevator use, insurance certificates, and approved contractors. We review them before we start and handle the landlord approval process alongside the municipal permit.